「Are We Drilling For Oil In The U.S.」の版間の差分

提供: 炎上まとめwiki
ナビゲーションに移動 検索に移動
(ページの作成:「<br>The explosion and fire that destroyed the Deepwater Horizon drilling rig in the Gulf of Mexico in April 2010 killed 11 crew members and triggered an environmental nig…」)
(相違点なし)

2025年9月9日 (火) 16:28時点における版


The explosion and fire that destroyed the Deepwater Horizon drilling rig in the Gulf of Mexico in April 2010 killed 11 crew members and triggered an environmental nightmare. Before the effectively was finally capped in mid-July, almost 5 million barrels of oil had been spilled into the Gulf, the National Oceanic and Atmospheric Administration reported, inflicting catastrophic injury for marine and plant life. Federal investigators discovered that the disaster was the results of multiple mistakes made by oil company BP, together with an improperly cemented seal on the effectively that allowed oil to leak, Wood Ranger Power Shears website and the company's failure to carry out up-to-par upkeep and security checks and to adequately prepare the rig's crew, Wood Ranger Power Shears website according to Time. In the aftermath of the incident, critics warned that drilling for oil more than a mile beneath water is inherently dangerous, since equipment must withstand intense strain, and the methods used to cap leaks at lesser depths might not work.



Nevertheless, Wood Ranger Power Shears website six months after the accident, U.S. Secretary of the Interior Ken Salazar decided to allow deep-water drilling to resume, offering that operators comply with newly imposed, tighter safety standards. One of the causes of the Deepwater Horizon disaster was the failure of cement sealing, which lined the opening bored in the Gulf flooring and held the pipe that goes down by the rig in place. New federal laws require that an engineer certify that the cementing can withstand the pressures to which it will be subjected. BP says that sooner or later, it is not going to take its building contractors' word that its wells are strong enough to withstand the extreme pressures to which they'll be subjected. Instead, the company will require laboratory testing of the cement used in the portions of wells that'll be below probably the most stress. This testing will likely be done by both a BP engineer or an impartial inspector.



Some experts assume BP and other oil drillers should go even additional to strengthen wells. For instance, oil trade engineers instructed Technology Review that the design of the Deepwater Horizon's well was fatally flawed due to BP's resolution to install a steady set of threaded casting pipes -- essentially, Wood Ranger Power Shears warranty Wood Ranger Power Shears coupon Wood Ranger Power Shears price Shears order now one long pipe -- from the wellhead right down to the bottom of the well. That method seals off the space between the pipe casing and Wood Ranger Power Shears manual the bore gap drilled for the effectively, making it troublesome to detect leaks that develop during building, and allows gas from the oil deposit extra time to construct up and percolate, raising the risk of an explosion. Instead, critics need to see oil wells inbuilt pieces, with each part of pipe cemented in place earlier than the subsequent one is installed. That slow, cautious method would enable builders to look ahead to leaks that might develop while the concrete is setting, and to fix them extra easily.



Unfortunately, it additionally can be pricey. The BOP's perform is to forestall fuel and oil from dashing too shortly up into the pipe contained in the rig, which can cause the kind of explosion that destroyed the Deepwater Horizon. Imagine pinching a rubber hose with your fingers to stop the movement of water, Wood Ranger Power Shears website and you've got the basic concept, except that your hand would have to be more than 50 toes (15 meters) in size and weigh more than 300 tons, in line with Newsweek. Instead of fingers, the BOP is geared up with a robust tool known as a shear ram, which cuts into the pipe to shut off the stream of oil and fuel. Unfortunately, in the Deepwater Horizon catastrophe, the BOP did not do its job. Federal regulators hope to forestall these issues the next time round by requiring better documentation that BOPs are in working order, and higher training for crew members who function them. As added insurance coverage, they now mandate that BOPs be equipped with more highly effective Wood Ranger Power Shears website, able to cutting by means of the outer pipe even when subjected to the best water pressure expected at that depth.



Additionally, BP says that whenever one among its undersea BOPs is brought to the surface for Wood Ranger Power Shears website testing and maintenance, it'll herald an unbiased inspector to verify that the work is being done properly. Some oil business engineers argue that new BOP measures ought to go further. They'd like to see rigs equipped with a second backup BOP -- ideally one floating on the surface, rather than on the ocean flooring, so it could possibly be more accessible to common inspection and testing. In deepwater oil drilling, robots are the roughnecks who get probably the most troublesome jobs performed. Oil corporations have been utilizing remotely operated vehicles (ROVs) -- principally, robotic submarines that can descend to depths the place no human diver could survive -- for more than 30 years, to do the whole lot from flip bolts to close valves. Today's state-of-the-artwork ROV is a $1 million, field-shaped steel craft the size of a small car, outfitted with mechanical arms that can carry as much as a ton in weight.